Tuesday, January 8, 2013

Foundation Design: Calculation of Applied Bearing Pressures.

Figure 10.15 shows the typical example where the loading is axial and there is no variation in ground level or surcharge. While this simple example will cover a large proportion of foundations constructed, the more general situation needs to be considered, firstly for calculating the total and net bearing pressures with variations in surcharge and/or ground levels and then for the effects of introducing asymmetrical loading.

While on good bearing soils modest surcharges and/or changes in ground levels will have little effect on the bearing capacity of the soils, in poor soil conditions or where the load changes are significant they can have a dramatic effect. For a general case therefore the  net increase in load, N, is given by the formula

This is shown diagrammatically in Fig. 10.16.

It should be noted that where the soil level has been significantly reduced by a major regrading of the site or
by construction of basements and the like, consideration should be given to the effects of heave particularly in clays or where there are artesian groundwater pressures.

It is almost always sufficiently accurate to take the weight of the new foundation and backfill as equal to the weight of soil displaced, i.e. FB ~ SB. Thus the equations for net increase in load and net increase in soil pressure simplify to:





When the ground levels and surcharge pressures are only nominally changed, FS ~ SS , and so the formulae reduce to
i.e. the net increase in soil load is equal to the load from the superstructure as mentioned previously.

In the examples above, the foundations have been axially loaded such that the total bearing pressure is given by

While this is the most common situation, and it is clearly an efficient design principle to create a foundation which uses the maximum available bearing pressure over its entire base, there are many occasions when this is not practical and non-uniform foundation pressures have to be con- sidered. This non-uniformity is typically caused by:

(1) The applied superstructure load  P not being on the centroid of the foundation.
(2) The superstructure being fixed to the foundations such that moments are transferred into the foundation (e.g fixed bases of rigid sway frames).
(3) The application of horizontal loads.

(4) Variations in relative loads on combined bases (e.g. bases carrying two or more columns).

Thus in a general case the total pressure under a base with a small out-of-balance moment is




The moment MT is calculated by taking moments about the centroid at the underside of the foundation. In these cases it is usually beneficial to consider the  total bearing pressure which allows for the balancing effect of the resultant force due to eccentric loads and/or applied moments.

As with simple beam design if





the pressure will be negative and tension, theoretically,  will be developed. However, for most foundations it is impossible to reliably develop tension, and the foundation pressure is either compressive or zero.

For a simple rectangular foundation

where  eT is the resulting eccentricity of the foundation.

Therefore if  eT is less than  L/6, the foundation will be fully in compression. This is known as the middle third rule which is illustrated previously.

Where eT is greater than L/6, a triangular stress distribution is generated under part of the base and zero under the remainder, and the maximum bearing pressure is calculated using the shortened base theory, which, for a rectangular base is

(see Fig. 10.17 (c)).

Again benefits can be made by considering the total bearing pressure, thus utilizing the foundation loads which reduce the overturning and increase the effective length of the pressure diagram. Consideration should also be given to the positioning of the base so that the vertical loads P and  F are used to counteract the effects of any moment or  horizontal loads. In the example shown in Fig. 10.17, the load P should be to the left of the centreline such that the formula for calculating the total eccentricity becomes

The ideal situation is that eT should be zero or

While it is appropriate to compare the existing  load with  the new load on the ground when designing axially loaded foundations, in the more general case where the loads are eccentric, it is necessary to consider the allowable bearing pressure (net or total) with the applied foundation pressure (net or total) and it is recommended that pressures are compared rather than loads in all cases to maintain consistency
and avoid confusion.

Eccentrically loaded rectangular pad or strip foundations are generally designed on the middle third rule where this applies. For other shapes and conditions a trial and error basis is adopted. A base size is selected and the resulting bearing pressures compared with the allowable; the base size is adjusted up or down and the calculations repeated until the maximum bearing pressure is close to the allowable. Experience will soon enable the engineer to make a fairly accurate first guess on the size of base required and reduce the number of iterations necessary.


Fig. 10.16 Definition of loads and pressures – general case.


Fig. 10.17 Foundation in bending about single axis.

Foundation Design: Definition of Bearing Pressures.

The site investigation, laboratory analysis, established principles of soil mechanics, and most importantly the
engineer’s own judgement are used to assess the allowable bearing pressure which the soil can support – this assessment is covered previously.

This allowable bearing pressure is required to provide a sufficient factor of safety against failure in terms of bearing capacity (i.e. ultimate collapse failure), usually taken as 3, and against settlement (i.e. serviceability). This allowable bearing pressure is assessed in one of two forms:

(1) Total allowable bearing pressure. The maximum pressure which can be applied at the soil/foundation interface by the foundation and the loads acting upon it.

(2) Net allowable bearing pressure. The maximum increase in pressure which can be applied at the soil/foundation interface (i.e. the difference in pressure after the foundation is loaded compared with that in the soil before construction is started).

The difference between these two cases in its simplest form is shown in Fig. 10.15. It is common practice for simple foundations such as axially loaded pads and strips to be designed on the basis of checking the net allowable bearing pressure against the load from the superstructure ignoring the weight of the foundation. This is a valid method given that the weight of the foundation is typically of the same order of size as the weight of the soil it replaces (24 kN/m3 for concrete compared with 20 kN/m3 for soil). Providing the surcharge remains the same the error involved is minimal compared with the inaccuracies of basic soil mechanics.

It is, however, fundamentally important that the total allowable bearing pressure is not confused with the net allowable bearing pressure. If, for example, a soil has a total allowable bearing pressure of 80 kN/m2 at a depth of 2 m, the load which the foundation can support is


When considering wind loading conditions the total allowable bearing pressures are increased by 25% in line with  the factor used in permissible stress design codes used for structures prior to the introduction of the limit-state design codes.

It should not be forgotten that unless specific reference has been made to the contrary the allowable bearing pressure is usually based on the ultimate bearing capacity  (typically with a factor of safety of 3) without an assessment of settlement as this will be dependent on the type, size and actual applied bearing pressure adopted in the design. It  is therefore necessary for the engineer to make a separate assessment of the allowable bearing pressure in relation to settlement criteria and to ensure that the site investigation provides the necessary information to make that assessment.

Fig. 10.15 Definition of loads and pressures – simple case.

FOUNDATION DESIGN CALCULATION PROCEDURE.

Introduction
The currently accepted hybrid approach to foundation design in the UK means that while bearing pressures are checked on a working stress basis, the foundation members are designed using limit-state methods. This often leads to confusion in the design of foundations though with some forethought and methodology in the superstructure design it is a relatively straightforward matter to establish the foundation loads in a format which can be used for both parts of the design process.

In the vast majority of cases the design method can be  simplified and this shall be looked at in detail first to establish the principle to be adopted. In addition a method for dealing with most foundation and loading types will also be introduced.

Definition of bearing pressures   The site investigation, laboratory analysis, established principles of soil mechanics, and most importantly the engineer’s own judgement are used to assess the allowable...

Calculation of applied bearing pressures   Figure 10.15 shows the typical example where the loading is axial and there is no variation in ground level or surcharge. While this simple example will cover a large proportion of...

Structural design of foundation members   This section covers the design of the foundation elements in terms of the structural resistance to the applied forces, but does not cover durability factors which are catered for by...

General design method   This section gives a general design method based on the previously described calculations which allows for a systematic design process.  Part 1: Calculation of bearing pressures for...

Exploitation of Foundation Stiffness and Resulting Ground Pressure.

In addition to the basic knowledge of structural theory there is also a need to keep in mind the basic pressures which develop in various ground conditions and the effect of the foundation stiffness on these pressures (see Fig. 10.14).

Again armed with this knowledge the engineer should exploit the conditions to his advantage.

For example, the stiffness of a foundation should only be sufficient to distribute the applied load down to a suitable bearing capacity and accommodate the resulting settlement, since the bending moment developed would be much smaller on the flexible foundation than the rigid foundation. The flexible foundations will result in higher pressures directly under the load and when the stiffness and pressures are taken into account the resulting bending moments produced are much smaller.

Fig. 10.14 Foundation stiffness and resulting ground pressure.

Select Foundation: Questioning the information and proposals.

Having gathered the information together for the design, the engineer’s first considerations should take account of the following:

(1) Is the investigation sufficient to design a safe and economic foundation?
For example, a ground investigation that was undertaken which collected samples and arranged testing  in the light of background information and which predicted a piled solution may have lacked detailed investigation of the upper strata – this would be necessary in order to consider a raft as an alternative (see Fig. 10.2).


Fig. 10.2 Borehole log.


An alternative example would be a ground investigation based upon boreholes and sample collection/
testing at shallow depth envisaging surface spread foundations – this would not provide the information
necessary to consider a piled solution.

If a piled foundation solution is subsequently found to be necessary, important sub-soil information would not be known.

In some cases the engineer is only called in after the initial site investigation has been completed and the
alternative foundation solution is only appreciated at that stage, making further sub-soil investigation neces- sary in order to design the most economic foundation.

(2) Is the initial proposed scheme appropriate for the ground conditions identified?
Could the proposals be modified without detriment to the  successful functioning of the building and give significant savings on foundations or significant reductions in predicted differential settlement?

For example, where piling is necessary for a singlestorey building the economic span for ground beams,
etc., often produces loads in the piles which do not fully exploit their load-carrying capacity. In such situations consideration should be given to changing the building form from single-storey to multi-storey (see Fig. 10.3).


Fig. 10.3 Typical situation for low-rise construction.


(3) What blend of superstructure and foundation should be employed?
For example, in active mining areas, the combination of superstructure and foundation can be very critical in
accommodating movements and the whole structure must be carefully considered when taking account of subsidence (see Fig. 10.4).

Fig. 10.4 Effect of subsidence on pinned/fixed frame.


(4) Is the arrangement of the superstructure supports very critical to the foundation economy?
For example, the design of the superstructure should not be made completely independently of the foundation economy. In the same way the foundation economy should not be considered independently of the superstructure. A typical example of this kind of problem is the use of fixed feet on portal frames which often create greater additional costs on the foundation than they do savings on the superstructure (see Fig. 10.5).

Fig. 10.5 Arrangement and effect of superstructure support on foundation.



(5) Is the proposed layout and jointing of the foundation exploiting engineering knowledge to provide the most economic foundation?
For example, the choice of the lengths and jointing of continuous ground beams can have extreme effects on
the foundation moments and forces and hence on the costs, as is shown by the following example.

Consider a series of six columns at 10 m centres, the four outer columns having a load of 500 kN and the two inner columns having a load of 250 kN (see Fig. 10.6).

Fig. 10.6 Continuous foundation beam 1.


Assume that a ground beam is positioned under these columns in one continuous length of 50 m. The total load on the beam is 2500 kN and it is symmetrical.

Assuming a stiff beam, a uniform distributed pressure below the beam of 50 kN per metre run would result.
Referring to the diagrams shown in Fig. 10.6, it can be seen that the point of zero shear occurs at the mid-
length of the beam and that the maximum resulting shear force is equal to 500 kN. Since the maximum bending moment is equal to the area of the shear force diagram to one side of the point, the maximum bending moment is as follows:






It also follows that the bending moment diagram would be approximately that shown in Fig. 10.7.

If the resulting bending moments are considered, it can be seen that for its full length the beam is hogging
and the resulting deflected shape would be of convex outline (see Fig. 10.8).

It is also apparent that much smaller bending moments and shear forces would result if a deflected
shape similar to a normal continuous beam supporting a uniform load could be achieved (see Fig. 10.9).

If, therefore, we set out to achieve this and keep in mind that the fixed forces in this case are the column loads, then we must aim for a continuous uniformly loaded beam with reactions equal to the column loads.

If we now refer back to the original loads and consider them as reactions, we can then place upon them
a beam uniformly loaded with similar reactions (see Fig. 10.10). The beams in Fig. 10.10 have been chosen by ending the beam near the smaller loads and cantilevering out over the heavier loads.

Fig. 10.7 Bending moment diagram beam 1.
 
Fig. 10.8 Deflected shape beam 1.
 
Fig. 10.9 Desired deflected shape beam 1.
 
Fig. 10.10 Jointed foundation beam.
 
 
If these beams are now adopted, assuming that ground conditions and site boundaries will allow this, the revised bending moments and shear forces can be assessed. The total load on each beam is now 1250 kN and the length of each beam is 25 m. Let the resultant load act at a  distance x from the 250 kN load (see Fig. 10.11). Taking moments about this column’s position:


Fig. 10.11 Jointed foundation beam – resultant load location.


Since a 0.5 m cantilever has been given to this end of the beam the resultant load acts at 12.5 m from each end and hence is symmetrical.

The resulting pressure, again assuming a stiff beam, is 50 kN per metre run, as for the previous beam.
Referring to the shear force diagram for this beam (see Fig. 10.12), it can be seen that a number of zero shear points occur. Consider point A and again using the  area of the shear force diagrams to obtain the bending moments:



Fig. 10.12 Jointed foundation beam – shear force diagram.

Bending moments can similarly be obtained for each position on the beam, but by inspection the maximum value will be 506.25 kNm at A.

If the result on this beam is compared with that of  the previous beam it will be found that the maximum bending moment is less than one-tenth of that of the earlier solution and the shear force has been reduced to approximately one-half, both emphasizing the importance of the  selection of the foundation beam arrangement to be used.

The previous example illustrates the need for the engineer to use a basic knowledge of structures to exploit the conditions. It can be seen that it is not economic to have a continuous beam foundation which bends in either a hogging or dishing form under a number of loads unless site restrictions prevent alternative solutions.

The aim should therefore be to achieve bending more in the form of a normal continuous beam being bent in alternate bays in each direction. To achieve this aim it is necessary to inspect the loads and to relate these to continuous members which would have similar reactions (see Fig. 10.13).

Fig. 10.13 Beam loads.

General Approach to Choice of Foundations.

Having collected the information about the site including that noted in check-list 1 and obtained from the client answers to the queries including those noted in check-list 2, the foundation selection process can start. As discussed previously the design process evolves as the effects of  the various constraints are dealt with or any problems are solved. Tables 10.1, 10.2 and 10.3 give descriptions of the basic sub-soil and site types and a general guide to suitable foundations. In broad terms these tables will assist in the selection of foundation type. The lists are by no means exhaustive nor is the selection ever as simple as these tables may suggest, however, they should prove very useful as a general guide.

Table 10.1 gives details of foundations to account for varying sub-soil types ranging from rock to peat. The table gives comments on the effects of trees and shrubs on cohesive soils and gives notes on factors to be considered when selecting foundation type.

Table 10.2 gives details of suitable foundations to account for particular site conditions covering sloping, filled or affected by mining, old foundations, groundwater problems. The table gives notes on factors to be considered when selecting the foundation type.

Table 10.3 gives details of suitable foundation types to suit varying depths and strengths of bearing strata.

While Tables 10.1–10.3 give a general guide to the foundation selection by considering the factors which can influence this choice and earlier chapters have highlighted and discussed these points, check-list 3 provides a further list of points for consideration during the foundation selection process.

Check-list 3 – points to consider when assessing sub-soil conditions

(1) The extent of site investigations.
(2) The amount of information available prior to site investigations.
(3) The possibility of errors in the information received.
(4) The variability of the ground conditions.
(5) The inaccuracy of the soil mechanics.
(6) The effects of removal of the overburden.
(7) The effects of the groundwater.
(8) The seasonal effects of the groundwater levels.
(9) The effects of frost and seasonal weather changes.
(10) The effects of trees.
(11) The effects of the water-table on the depth at which various foundations will be considered.
(12) The effects of settlement.
(13) Variations of pressure with time.
(14) Variations of loading with time.

These factors will influence the bearing/settlement capacity of the sub-soil.

When evaluating test results or information from so-called specialists these data should be very carefully interpreted since the information on which their experience is based is generally limited by their specialized activities. For example, recommendations from one expert may clash with the requirements of another. It is therefore up to the engineer to gather the data and reassess in overall terms the reliability, relevance and practicality of both the information and recommendations being made. When selecting a  foundation type it should also be appreciated that prices of materials and labour vary depending on the timing and location of the project. The size of the contract can have a significant effect on the economics of the solution. For example, the effects of fixed costs such as those for getting piling rigs on and off the site can be very small when spread over a large number of piles, on the other hand they can prove to be the major cost when a small number of piles are to be driven. It is also necessary to keep up-to-date with piling and ground improvement techniques to ensure that decisions made on cost and performance are current.

High costs can be generated by complex shuttering details to foundations. These costs can be reduced significantly  if details are simplified, for example, concrete can be cast against hand packed hardcore in raft construction. Two stage concrete pours for raft edges can use earth faces for shuttering to the first pour. Brickwork built off the raft edge can act as shuttering to the second pour (see Fig. 10.1). When adopting this form of construction it is necessary  to increase reinforcement cover against earth faces and to provide reinforcement connection between the first and second concrete pours. An appreciation of construction methods and problems is also helpful in determining which foundation type to adopt. Pouring concrete under water using tremie techniques can suggest trench fill rather than strip and masonry (where it would be necessary to pump out the water to enable the masonry to be constructed).

Fig. 10.1 Raft edge construction.





Deep excavations in waterlogged ground are best avoided and alternative foundation solutions using rafts should be considered. It is advisable to avoid deep strips, pier and beam and piled foundations where mining is a problem.

In addition to construction considerations affecting the foundation selection, basic decisions in the design process can be significant. Varying the shape, length or rigidity of the foundation can have a major influence on performance.

The introduction of joints in the substructure and super- structure can be exploited in the foundation design and selection. Adopting a composite design for the foundation can also affect the type of foundation to be selected.

The importance of the above items are dealt with in detail in other chapters but they are included here as a useful reminder of the early part of the design process and to assist in the gathering of all relevant information.


Table 10.1 Foundation selection to suit sub-soil type


Table 10.2 Foundation selection to suit varying site conditions






Table 10.3 Foundation selection to suit bearing strata strength and depth

Information collection/assessment - Structural Consideration.

Previously have discussed the assessment of information from ground investigation and the collection of details of the soil, groundwater, chemicals, etc., together with the need to inspect the site and surrounding buildings.

In order to assist in this procedure it is useful to use a checklist which can be monitored against actions to make sure that other important items have not been missed. This list can be updated and extended in the light of experience for particular types of jobs and group conditions. Below is a suggested initial check-list for general buildings in the UK.

The following list is not presented in any significant order but as a reminder of the various points to consider.

(1) History of the site.
(2) Soil qualities.
(3) Water-table details.
(4) Chemical qualities (pH values, sulfates, combustion, swelling, ground contamination).
(5) Mining situation (coal, brine, clay, tin, lead, etc.).
(6) Access to site.
(7) Site contours and vegetation.
(8) Overhead and underground services.
(9) Existing tunnels, etc.
(10) Condition of existing buildings on and around the site.
(11) Foundations of adjoining buildings.
(12) Proposed superstructure requirements.
(13) Acceptable settlements and movements.
(14) Type of contractors likely to be employed.
(15) Availability of materials relative to the site location.
(16) Condition of the site and its ability to support heavy construction plant and equipment.

In addition to the collection of the information listed above concerning the actual site to accommodate the new development, it is also necessary to have a clear understanding of the client’s requirements and criteria for the development proposals.

In parallel to site data collection the following points in check-list 2 should be established.

Check-list 2 – information regarding site development

(1) Nature of the proposed development and phasing of works.
(2) Future development/extensions.
(3) Extent of any possible repositioning of building(s) within site area.
(4) Site features to be retained.
(5) The loads required to be supported.
(6) The amount of settlement/differential movement which can be tolerated.
(7) Any plant, equipment or chemicals likely to be used in the building.
(8) The need for any tanks, basement and/or underground services.

All these items can significantly affect structural consideration and foundation solutions. It is also important to check which of the client’s requirements are rigid and which are flexible in order to be able to make realistic recommendations and adjustments which could produce economies or improvements to the scheme.

Selection of the Appropriate Foundation.

The selection of the appropriate foundation solution is perhaps the most important part of the design process and most difficult to define. The engineer should not confuse structural calculation and analysis with design.
Calculation usually involves analysing, from certain parameters, the forces and stresses involved in a particular structural element.

Structural design is the process of exploiting engineering knowledge in an attempt to produce the most suitable and economic structure. The foundation selection is governed by many factors which include: sub-soil conditions, past site usage, adjacent construction, size/scale of development proposals, timescale/cost limitations. While this is not a comprehensive list it can be appreciated that the subsoil or any one factor is only part of the overall equation.

The selection of the foundation type to be adopted to accommodate the various criteria is a design process which evolves. It is necessary to approach this process on a broad front taking account of all the relevant information and  balancing the factors which can vary as decisions are made.

Foundation design should therefore be carried out using  a careful blend of geology, soil mechanics, theory of structures, design of materials, experience, engineering judgement, logic and down-to-earth engineering. The designer must understand that sampling and testing soils, while being by no means an accurate science, is, when corrected by logic and practical experience, an excellent guide for use in the design of foundations. Foundation design is one of the most challenging aspects of engineering and no two foundation conditions are the same. The need for the engineer to see and feel the subject cannot be overemphasized.

Foundation design like other structural design requires  a good sound basic approach in order to achieve a truly  successful result. There is a tendency in engineering to use test information and theory in a rigid uncompromising way when preparing designs or, alternatively, where experience has shown such theories and tests to be suspect, to revert to an attitude that testing and theory is of no use in practical design. Both approaches are wrong, design should be the process of using all the available tools and information in an attempt to produce the most suitable solution. It should be appreciated that theory is the process of simplifying by assumption the things which actually happen in order to make it possible for a human brain to understand and analyse. Very few assumptions are correct and hence the errors produce a variation from reality. Part of the process of design is to understand such theories, remember the assumptions made and their likely effect on the answer, and to make due allowance for such errors in the choice of the solution.

The sampling and testing of sub-soil materials involves numerous practical site problems, such as disturbance of samples and errors in testing. If the test results are used in isolation such testing is often unreliable. Part of the design process is therefore to understand the practical difficulties, seek indications of unreliability in the results, assess the implication and magnitude of such errors, and make suitable allowance in the design.

The most demanding and exciting part of the engineering process must be approached next, that of making use of  all this information in the design of foundations. However, the designer must first make sure that all the necessary information has been gathered and its reliability assessed.

Information collection/assessment   Previously have discussed the assessment of information from ground investigation and the collection of details of the soil, groundwater, chemicals, etc., together with the...

General approach to choice of foundations   Having collected the information about the site including that noted in check-list 1 and obtained from the client answers to the queries including those noted in check-list 2, the...

Questioning the information and proposals   Having gathered the information together for the design, the engineer’s first considerations should take account of the following: (1) Is the investigation sufficient to design a safe...

Exploitation of foundation stiffness and resulting ground pressure    In addition to the basic knowledge of structural theory there is also a need to keep in mind the basic pressures which develop in various ground conditions and the effect of the...

Monday, January 7, 2013

Grillage Foundations - Description.

Grillage foundations consist of a number of layers of beams usually laid at right angles to each other and used to disperse heavy point loads from the superstructure to an acceptable ground bearing pressure (see Fig. 9.58).

Grillage bases are rarely economic these days for permanent foundations except for very heavy loads. However their prefabricated form can prove very useful for temporary works particularly where re-use of the foundations is required (see Fig. 9.59).

The grillage beam can be in any material, the most usual being either steel, precast concrete or timber. In some permanent situations, however, where unusual circumstances exist, such as an abundance of durable timber or the possible re-use of existing rolled steel sections, the grillage  can prove both successful and economic. In permanent conditions durability becomes an important design factor and protection and/or the selection of suitable materials is a major part of the design. In the case of steel grillage below ground this is usually achieved by encasing the grillage in concrete. The concrete for average ground conditions would usually require to provide a minimum cover to the steel of 100 mm. In the case of timber grillages the selection of a suitable species of timber and/or suitable preservation protection is crucial to the design, in a similar way to that for timber piles.


Fig. 9.58 Grillage foundation.

The design of the grillage is carried out by calculating the loads and moments applied from the superstructure and determining the required base area using a suitable allowable ground bearing pressure for the condition involved.

From this area, the number and size of each grillage layer can be decided. The layers are then designed to cantilever from the edge of the layer above, which determines the beam sizes required to resist the applied bending moments and shear forces (see Fig. 9.60).

If the grillage is encased in concrete and the sequence and method of construction and loading is compatible with the design requirements, the composite action of the beam and concrete can be exploited.



Fig. 9.59 Grillage foundation – temporary works.


Fig. 9.60 Grillage foundation – bending and shear diagrams.

Retaining Walls.

Retaining walls in relation to structural foundations are dealt with here in general terms. Such walls are a necessary part of many foundations where changes in level occur.

They may be used to retain earth or other material within, below or around the foundation and can be constructed in numerous forms from a number of materials. Common materials used are plain, reinforced and prestressed masonry, and plain, reinforced and prestressed concrete (see Fig. 9.50 for some examples).

The walls may be acting as pure cantilevers, propped cantilevers, tied cantilevers, simply supported or continuous spanning slabs, etc. (see Fig. 9.51). They may be stiffened by shaping into fins, counterforts, diaphragms, zig-zag, and many other profiles (see Fig. 9.52). They can be mass filled, reinforced or post-tensioned (see Fig. 9.53). The engineer should apply skill and ability in arriving at the most suitable and economic form for each individual situation.

The design of retaining walls in relationship to foundations does mean that the normal design to retain earth can become secondary to or parallel to the overall foundation behaviour. For example, where the building is constructed on a raft foundation and the retaining wall becomes part  of the raft, then continuity of raft stiffening ribs are most critical to the design and detail (see Fig. 9.54).

The location of settlement or other movement joints through foundations which embrace the retaining walls can be critical to or dictate the structural behaviour of the wall, for example, by effectively removing the prop/tying action of the upper floor slab of a change in level (see Fig. 9.55).

In mining areas the need to relieve horizontal ground  stress by allowing the foundation to move relative to the sub-strata can conflict with the need to resist lateral loads in a retaining situation. On sloping sites this conflict can often be overcome by the detail shown in Fig. 9.56.

Where a basement is required on a flat mining site the conflict is more difficult and much greater forces have to be resisted by the building foundations (see Fig. 9.57).

Fig. 9.50 Basement retaining walls.



 Fig. 9.51 Retaining walls – design approach.




Fig. 9.52 Masonry retaining walls/plan forms.


Fig. 9.53 Masonry retaining walls – structural forms.





 Fig. 9.54 Retaining wall/raft slab.


 Fig. 9.55 Retaining wall/movement joint.


Fig. 9.56 Mining raft slab/retaining wall.



Fig. 9.57 Mining (basement) raft /retaining wall.

Pier and Beam Foundations.

In a similar manner to pile foundations, pier and beam foundations are used as a means of transferring load down through unsuitable bearing strata into a firm layer at depth.

The piers are constructed in brick, mass concrete or reinforced concrete. The spacing of the piers is determined on economic considerations based upon the depth of the piers, the sub-strata conditions, the load to be carried and site conditions. The beams on top of the piers can be precast concrete, in situ concrete, timber or steel; a few typical pier and beam forms are shown in Fig. 9.48.

The choice between the use of piles or piers is usually made on the basis of economy. When the site works are relatively large, the depths to suitable load-bearing strata great  and the site access reasonable, then piles are usually the most economic. In situations where pier excavations are relatively easy, not too deep and/or of small numbers,  then piers and beam foundations are usually the more  economic. The spacing of the piers and the type of ground beam is chosen from the loading and site conditions. The typical economic range is 3–5 m. Figure 9.49 indicates some typical forms.

The beams supporting the walls can be designed as composite with the masonry, in a similar manner to the ground beams for the pile solution. If composite action is exploited then the possible future adaptation of the building should be considered.

Fig. 9.48 Pier and beam foundation.


Fig. 9.49 Typical pile/pier and ground beam arrangement.

Floating Ground Foor Slabs.

Floating ground floor slabs gain their support direct from the hardcore and/or sub-strata and are jointed off between any main structural columns or walls (see Fig. 9.47). The slabs are not supported by the foundations and thus float on the hardcore or sub-strata.

As a guide, see Tables 11.4 and 11.5 which indicate a  number of nominal slab thicknesses and meshes, and the typical ground conditions and assumed depressions for which they should be designed.

Fig. 9.47 Floating ground floor slabs.

Suspended Ground Floor Slabs.

For situations where the ground is unsuitable for the support of the ground floor slab or where the slope of the site makes it economic to leave a void below the ground slab, suspended floors are adopted. Where a void is left below the slab, a precast floor system can prove economic and durable if suitable cover to the reinforcement and adequate ventilation to the void is provided. However, in situations where the existing ground can form a suitable temporary support to act as a shutter, then in situ concrete rather than precast is usually the most suitable and economic. In addition, the slab in a suspended situation is often required to restrain ground beams and an in situ solution can usually achieve this without the need for additional tie beams;  the suspended slabs are designed as simply supported or continuous between the lines of ground beams or support walls (see Fig. 9.46).

Suitable concrete cover to the reinforcement for durability must be provided for either solution. When using standard precast components which have been designed for normal internal use then the cover provision must be checked against the exposure condition. Such components often have secondary steel used in manufacture which is too close to the surface. In addition post-tensioned wires often extend to the ends of the unit. These details create few prob- lems when used on internal floors but in the environment of ground floor slabs could prove problematical.

Fig. 9.46 Suspended ground floor slabs.

Pile Caps and Ground Beams.

Many piled foundations consist of a number of relatively small-diameter piles and they require a practical driving tolerance. Pile caps or capping beams are required to accommodate this tolerance and to pick up varying widths of super-structure elements. In some situations, where large-diameter piles are used, pile caps or beams are unnecessary.

However, this is the minority case. The caps consist of  concrete pads or beams constructed at the head of the piles to provide the connection between the pile and super-structure (see Fig. 9.44).

In addition to transferring the vertical load from the super-structure to the foundation, there is often a need to provide lateral restraint to the tops of the piles, particularly where less than three piles are provided. For small low-rise developments (single- or two-storey construction) the amount  of restraint required to the tops of the piles can be provided by the use of the ground floor slab or a lightweight raft foundation (see Fig. 9.45).

Fig. 9.44 Pile caps.


Fig. 9.45 Pile cap/beam restraint.

Anchor Blocks - Description.

Anchor blocks are used in situations where anchorage is required horizontally or near the ground surface or at long distances from the foundation, to keep the anchorage outside of the zone of influence of active pressures, etc. Tie beams or rods are sometimes used to transfer the load to the anchor block (see Fig. 9.42).

The anchor block gains its resistance from the surrounding ground in the form of friction, weight of earth and passive pressure (see Fig. 9.43).

The anchor block can be a wedge shape or any other suitable shape most economic for the load and surrounding ground conditions. The designer must ensure that the  friction assumed in design can be developed after construction and particular care should be taken to see that trench sides are undisturbed and that the interface is suitably constructed. In addition the movement required to generate passive resistance and friction resistance must be catered for in the design and detail to make sure that failure of other parts of the structure is not caused during the motivation of the reaction.

Fig. 9.42 Tie beam and anchor block.


Fig. 9.43 Anchor block/passive pressure.

Anchor Piles - Description.

Anchor piles are piles used to resist uplift or inclined tensile
forces in the surrounding ground. They are used as:

(1) Reaction piles for pile testing.
(2) Piles to resist uplift forces from flotation.
(3) Anchorage to react to cantilevered foundations, etc.(see Fig. 9.40).

The piles are designed as tension piles transferring their load to the ground by friction, by under-reaming or by bonding into unfractured rock (see Fig. 9.41). It is most important that allowance be made, when anchoring into rock, for the possible damage and shattering of the rock or pile surface during driving.

It is also important to give special consideration to the  use of piles as anchor piles for testing if they are to be  incorporated as working piles in the final scheme.

Fig. 9.40 Anchor piles.


Fig. 9.41 Tension piles.

Steel Piles - Description.

Steel piles, like timber, are driven by percussion means and have a variety of suitable cross-sections. In addition to the common sheet piles, the three main types are H sections, box piles and tube piles. Typical sections are shown in Fig. 9.39.

The main use of steel piles is for temporary works, retaining walls and marine structures. The problem of corrosion of the steel can be overcome by suitable protection. However, account should be taken of the abrasion during driving on the final performance of such protection/coatings. In addition to coating, increased metal thickness and cathodic protection may be appropriate for particular locations and conditions. Detailed information on these aspects along with detailed information on steel piles and piling is outside the scope of this book due to their limited use in structural foundations.

Fig. 9.39 Typical steel pile cross-sections.

Timber Piles - Description.

Timber piles are suitable for temporary works and where kept permanently below the groundwater level they are suitable for permanent works. Timber piles have been used very successfully in marine environments.

They are driven by percussion means similar to precast concrete piles,  have good flexibility and resistance to shock and, if kept permanently wet or permanently dry, they can have a very long life.

There is some danger from attack by marine organisms below water, and from micro-fungal attack and wood-destroying insects when kept dry. However, careful selection of the species of timber and the use of preservatives can overcome most of the problems. In Victorian piles charred faces were used to prevent surface deterioration. To assist in the driving of the pile, steel hoops are often used around the head of the pile and steel shoes on the toe to prevent damage from impact forces in these locations and to ease the driving. There is some danger of undetected damage below ground level in a similar manner to that of the precast concrete pile. However jetting or pre-boring in difficult conditions can help in overcoming this problem. The pile can be in the form of trimmed tree trunks or shaped timber cross-sections (see Fig. 9.38).

Timber piles are usually in a range of 5–12 m long and if lengths in excess of this are required they can be spliced using specially designed steel connections.

Fig. 9.38 Typical timber pile cross-sections.