Pile Groups.

It is sometimes necessary to drive a group of piles to support heavy loadings and it is important to notice two effects:

(1) The pressure bulb of the group affects deeper layers of soils than a single pile of the same depth (see Fig. 14.13) in a similar manner to a wide foundation.
(2) The load-bearing capacity of a group is not necessarily the product of the capacity of the single pile times the number of piles. There can be a pressure ‘overlap’ (see Fig. 14.14) and the capacity of the group could decrease as the difference between a pad and strip foundation.

A single pile, in driving, displaces soil which can result in heave at ground level and a group can cause greater heave and displacement; this fact should be checked and considered. Driving a single pile, too, in loose sand and fills will compact the soil around the pile to a diameter of approximately 5.5 times the pile diameter and make it denser. If a group of piles is driven it could create such a compact block of soil as to prevent driving of all the piles in the group. The central piles should be driven first and then, working out to the perimeter of the group, the remaining piles should be driven.

Section through pile pressure bulbs.
Fig. 14.13 Section through pile pressure bulbs.

Plan on pile pressure bulbs.
Fig. 14.14 Plan on pile pressure bulbs.

Spacing of piles within a group

Approximate values for centre-to-centre spacing are as follows:
 

(1) Friction piles – not less than the perimeter of the pile.
(2) End-bearing piles – not less than twice the diameter of the pile.

(3) Screw piles – not less than 1.5 times the diameter of the blades.
(4) Piles with enlarged bases – at least one pile diameter between enlarged bases.
 

These values are affected by the soil conditions, the group behaviour of the piles, the possible heave and compaction, and the need to provide sufficient space to install the piles to the designed penetration without damage to the pile or group.

Piles - Factor of safety.

BS 8004 recommends a factor of safety of between 2 and 3 for a single pile. The factor of safety is not a fixed constant and depends on the allowable settlement of the pile which is dependent on the pile’s surface and cross-sectional area, the compressibility of the soil, and the reliability of the ground conditions. The factor should be increased when:

(1) The soil is variable, little is known of its behaviour or its resistance is likely to deteriorate with time.
(2) Small amounts of differential settlement are critical.
(3) The piles are installed in groups.

The factor may be decreased when:

(1) As a result of extensive loading tests, the resistance can be confidently predicted.
(2) As a result of extensive local experience, the soil properties are fully known.

A common factor of safety taken in design is 2.5. A properly designed single 500 mm diameter pile driven into noncohesive soil is unlikely to settle more than about 15 mm.

In a load test the settlement is noted for increasing increments of load and a settlement/load graph is plotted. The graph resembles that of the stress/strain graph for many structural materials (see Fig. 14.12). Up to working load there tends to be practically full recovery of settlement on removal of load but beyond that loading there is likely to be a permanent set (as in steel loaded beyond the elastic limit) and at ultimate load there is likely to be no recovery at all.

Load/settlement graph.
Fig. 14.12 Load/settlement graph.

Wednesday, February 13, 2013

Choice of Pile.

Having found a satisfactory pile and a reliable and cooperative piling contractor for a particular site and conditions, there is a temptation for a busy designer, with  inadequate time to investigate the wide choice of piles and systems, to use the same piling contractor for all future  projects. This understandable reaction does not make for cost effectiveness nor structural efficiency. A guide to the choices available is given below:

(1) The piling system must provide a safe foundation with an adequate factor of safety against failure of the foundation on supporting soil.

(2) The total settlement and differential settlement must be limited to that which the structure can tolerate.

(3) The pile should be the right type of pile for the ground conditions and structure.

(4) The driving of the piles and the load they impose on the soil must not damage neighbouring structures.

(5) The piles must be economic and durable, and where speed of construction is important, quick to place.

1 Ground conditions and structure

(1) When invited to tender for the contract the piling contractors should be provided with a soil report, the position and magnitude of structural loads and the location of the structure together with information on adjoining properties. They should also be asked to visit the site to inspect the access for piling plant movements.

(2) Driven and cast-in-place piles, where the shell is left in, are used on sites over water (jetties, piers, etc.), on sites known to contain large voids, and on sites subject to high water pressure. Driven piles should not be chosen where the ground is likely to contain large boulders but they are one of the best piles for loose-to-compact wet sands and gravels.

These types of piles are frequently the cheapest to use on building sites with light-to-moderate pile loadings
and where the charges for moving onto site are spread over a large number of piles.

(3) Bored piles are frequently the lowest cost piles when piling into firm clays or sandstone and when vibration and ground heave would cause problems to existing adjacent buildings.
(4) Jacked piles need something to jack against and tend  to be expensive. Their main use is therefore in underpinning when they can prove to be cost-effective.
(5) Steel H piles are often chosen when long length  piles with deep penetration into sands and gravels are required.

2 Durability
The ground conditions can affect the choice and method of protection of piling material. Sulfates and acids will attack poor-quality concrete, some acids will cause problems with steel piles and alternate wetting and drying can cause timbers to rot.

3 Cost
Piles are, or should be, chosen as the economic and safe alternative to strip and raft foundations but there is more to cost analysis than comparing the cost per metre run of piles; there are on-costs. In comparing piling contractors’ estimates it can be unwise to accept the lowest cost per metre run.

Examination of extra over-costs for such items as extending lengths of piles, conducting check loading tests, etc. is  prudent. The designer should examine the piling contractor’s resources available to complete the project on time, the length of notice required to start work and the contractor’s experience in piling on similar sites. The  contractor’s reputation should be investigated and proof obtained of adequate insurance to indemnify building owners for any claims or damage to adjoining buildings  or failure of piles due to design and construction faults.

To the cost of the piles must be added the cost of excavation for constructing pile caps and any necessary tie beams. This increases the cost of construction supervision and design.

Decisions must be taken early so that design, detailing, construction and planning can be completed well in advance  of starting the contract. Too often the time is restricted by delays in site investigations, change of design brief, recent changes in contractors’ prices, etc.

Methods of Piling.

There is a wide variety of methods used for piling and every piling contractor has a number of variations for  their system – improvements in method and equipment continues. The main classes only are discussed below.

1 Driven piles
This method is used for piles of timber, precast concrete, prestressed concrete and the various types of steel piles.

The pile is hammered into the ground by pile-driving plant shown in outline in Fig. 14.10 (a). Methods of protecting the head of the pile from shattering are shown in Fig. 14.10 (b).


Driven piling.
Fig. 14.10 Driven piling.

Driven piles are classified as displacement piles and, where the soil can enter during driving, as small displacement piles (e.g. open ended tubular or other hollow sections often in steel).

2 Driven cast-in-place piles
A closed ended hollow steel or concrete casing is driven into the ground and then filled with fresh concrete. The casing may be left in position to form part of the whole  pile or withdrawn for reuse as the cast concrete is placed.

The cast concrete is rammed into position by a hammer as the casing is withdrawn ensuring firm contact with the soil and compaction of the concrete. Care must be taken to see that the cast concrete is not over-rammed or the casing withdrawn too quickly. There is a danger that as the liner
tube is withdrawn it can lift up the upper portion of in situ concrete leaving a void or necking in the upper portions of the pile. This can be avoided by good quality control of the concrete and slow withdrawal of the casing.

Driven cast in situ piles can prove to be economic for sands, loose gravels, soft silts and clays particularly when large numbers of piles are required. For small numbers of piles the on-site costs can however prove to be expensive.

3 Bored cast-in-place piles
The hole for the pile shaft is formed by drilling or augering and the toe of the hole can he enlarged by under-reaming in stiff clays to provide greater end-bearing capacity for the pile. The method tends to be restricted to clayey soils and, as with the driven cast-in-place pile, care must be exercised to prevent necking of the cast concrete. If they are used in loose sand or silt the inflow of soil into the bore must be  prevented. They can be installed in very long lengths and be of large diameter.

The relatively small on-site cost of bored piles means that smaller sites can be more economically piled than they can using a driven piling system. The bored pile is not usually economic in granular soils where loosening and disturbance of surrounding ground can cause excessive removal of soil and induce settlement in the surrounding area. During piling operations the hole can be lined with a casing which can be driven ahead of the bore to overcome difficulties caused by groundwater and soft sub-soil but sometimes difficulties of withdrawing the casing after casting can prove expensive.

4 Screw piles
Screw piles of steel or concrete cylinders with helical blades attached are screwed into the ground by rotating the blades. Their best application is in deep stratum of soft  alluvial soils underlain by firm strata. Due to the large diameter of the blades the piles have increased resistance  to uplift forces. Screw piles can be removed after use in  temporary works.

5 Jacked piles
Jacked piles are used where headroom for the pile and pile driver are limited as in underpinning within an existing building. The pile is jacked in short sections using the existing superstructure as a reaction frame.

6 Continuous flight auger piles
The flight auger pile system uses a hollow stem auger mounted on a mobile rig. The auger is drilled into the
ground with very little vibration and spoil removal. When the required depth has been reached (see Fig. 14.11), concrete or grout is injected through the auger shaft. Usually the concrete or grout mixing plant and the pumping equipment are located nearby but can, if such areas are sensitive, be located well away from such positions. Pile lengths of up to 25 m can generally be achieved with pile diameters from 300 mm to 600 mm. Piles can be raked up to an angle of 1 in 6 from vertical. The system is suitable for use in most virgin soils and fine granular fills and rigs can operate in areas with restricted headroom.

Flight auger pile.
Fig. 14.11 Flight auger pile.

7 Mini or pin piles
There are a number of mini or pin piles on the market. The systems range from water- or air-flushed rotary percussion augers to small-diameter driven steel cased piles which are driven to a set.

The pile diameters generally vary between 90 mm and  220 mm and can be used in most soils and with restricted access/limited headroom. Where necessary, noise and vibration can be kept to a minimum and piles can be driven within a few hundred millimetres of adjacent properties.

In underpinning they can be used to penetrate existing  concrete or masonry foundations, and can be bonded into the existing elements or form part of a new support system in conjunction with cast-in-situ ‘needle’ beams.

Slenderness of such small-diameter piles must however be taken into account and the need for good quality control particularly with regard to filling such small bores with concrete.

The piles are not generally suitable in mining areas where surface movements and lateral strains may be expected to distort or shear the piles.

Monday, February 11, 2013

Steel Piles.

Though most piling is carried out using some form of  concrete there are situations where steel piles should be considered. There is considerable experience of the use  of sheet piling in civil engineering which can be applied  to piles for structures. The piles are generally a standard  H section (see Table 14.1) or, for longer or more heavily loaded sections, tubular box section piles are used (see Table 14.2). In some cases they can form a structurally efficient and cost-effective solution. The advantages of steel piles compared with concrete are:

(i) They have a lighter weight for a required load-bearing capacity.
(ii) They can be used in longer lengths and extending them by butt welding is relatively simple. Similarly excess length is easily cut off.
(iii) They are more resistant to handling and driving stresses.
(iv) They can have good resistance to lateral forces, bending stresses and buckling.
(v) They are particularly useful for marine structures (piers, jetties, etc.) above water where the piles may be subjected to impact forces, ships docking, etc.

The disadvantages of steel piles are:

(i) There is a need for corrosion-protection.
(ii) The pile cost per metre run can be relatively high.
(iii) There are fewer piling sub-contractors competent to carry out the work.
(iv) There is a tendency for H sections to bend about the weak axis when being driven – the resulting curved pile has a lower bearing capacity.

The use of stones or large gravel in piling is now a well-developed technique. The authors have been involved  in extensive use of this form of piling for many years.

The method is used mainly as a geotechnical process to  consolidate and compact soils and/or to improve their drainage. The technique is discussed in detail previously and reference should be made to that chapter for further information.

Table 14.1 Steel H piles – dimensions and properties
Steel H piles – dimensions and properties





Table 14.2 CAZ box piles – dimensions and properties
CAZ box piles – dimensions and properties

Concrete Piles.

Concrete piles are the most widely used in the developed countries and may be cast in situ, precast, reinforced and prestressed.

(a) Precast
This type is commonly used where:

(i) The length required can be realistically predicted.
(ii) Lateral pressure from a stratum within the soil profile is sufficient to squeeze (neck) a cast-in-situ pile.
(iii) Where there are large voids in sections of the soil which would possibly have to be filled with an excessive amount of in situ concrete or could cause loss of support for wet concrete prior to setting.
(iv) For structures such as piers and jetties above water level on coastal, estuary and river sites.

Though precast piles can be manufactured on site it is  more common to have them designed, manufactured and installed by specialist subcontractors.

There are disadvantages in the use of precast concrete piles as follows:

(i) It is not easy to extend their length.
(ii) They are liable to fracture when driven into such obstacles as large boulders in boulder clay and the damage can remain out of sight.
(iii) Obstructions can cause the pile to deflect from the true vertical line.
(iv) There is an economic limit, restricted by buckling, of the unrestrained length of the pile.
(v) Noise and vibration caused by driving can cause nuisance and damage.
(vi) There can be large wastage and health and safety risks to the workforce caused by noise and vibration due to the need to cut off the projecting length after driving.
(vii) The accuracy of the estimated length is only proved on site when short piles can be difficult to extend and long piles can prove to be expensive and wasteful.
(viii) The relatively large rig required for driving often needs extensive hard-standings to provide a suitable surface for pile driving.

The advantages of precast concrete piles are:

(i) It is easier to supervise the initial quality of construction in precast than in situ.
(ii) The pile is not driven until the concrete is matured.
(iii) Stresses due to driving are usually higher than those due to foundation loading so that manufacturing faults are more easily discovered and, in effect, the  pile is preload tested (provided the defects can be detected).

The reinforcement, while adding to the load-bearing capa- city, is mainly designed to cope with handling, transporting and driving stresses.

(b) Cast in situ
There is an ever increasing variety of cast in situ piles offered by specialist piling subcontractors. The piles are
usually circular in cross-section and are regarded as small- diameter piles when their diameters are from 250–600 mm and larger-diameter piles when their diameters exceed  600 mm; large-diameter piles are now possible with dia- meters up to 3.0 m.

The advantages of cast in situ piles are:

(i) They can be constructed immediately, thus cutting out the time required for casting, maturing and delivering of precast piles.
(ii) There is no need to cut off or extend excessive lengths of the piles as they can be cast in situ to the required level.
(iii) They can be cast to longer lengths than is practical with precast piles.
(iv) Most obstructions can be hammered and broken through by the pile-driving techniques.
(v) The placing can cause less noise vibration and other disturbance compared to driving precast piles.
(vi) Soil taken from boring can be inspected and compared with the anticipated conditions.

The disadvantages of cast in situ piles are:

(i) It can be difficult to place and ensure positioning of any necessary reinforcement.
(ii) Concrete quality control is more difficult.
(iii) There is a danger of necking from lateral earth pressure.
(iv) Young concrete is susceptible to attack from some soil chemicals before it has set and hardened.

(c) Prestressed
Prestressed concrete in superstructure design is made of higher strength concrete, requires smaller cross-sectional area and can be made impact-resistant. The same results apply to prestressed piles relative to comparison with pre- cast reinforced piles. Their advantages compared to precast reinforced are:

(i) Handling stresses can be resisted by a smaller cross- section which can result in a more economical pile.
(ii) It is easier with the smaller section to achieve longer penetration into load-bearing gravels.
(iii) Tensile stresses that are generated up from the toe of the pile after the hammer blow can be compensated for by prestress.
(iv) The reduction of tensile cracking of the concrete can lead to greater durability.

The disadvantages of prestressed piles are:

(i) The smaller section provides less end bearing and total peripheral skin friction.
(ii) Deeper penetration into end-bearing strata (gravel, compact sand, etc.) may be necessary.
(iii) It is more difficult to extend the length of a precast driven pile.
(iv) As in prestressed concrete superstructure elements, stricter quality control in manufacture is necessary.

Timber Piles.

The oldest material used for piles is timber and it is still  in use, particularly in developing countries, today. It has proved surprisingly durable and provided care is given to the detail and treatment of the toe and head of the pile and the durability conditions it should still be used where it is economical. The toe can be subject to splintering during driving and should be tapered to a blunted point and,  if necessary, encased in steel. The head of the pile during driving may also need protection from splintering and this is usually provided by placing a driving cap or helmet over the head of the pile.

Where the top of the pile is below the lowest water level and is in permanently wet conditions, experience shows that there are few durability problems. However, when the level of the top of the pile or any part of it is in the area of a fluctuating water-table and is therefore subjected to alternate wetting and drying, this section of the pile should be treated with preservatives and water repellents and even then may still have a limited life.

If the length of the pile is found on site to be too long there is little problem in cutting off the excess length but there is a problem if the pile is found to be too short. Extending the pile involves splicing on an added length and any metal connections must be corrosion-resistant.

The choice of timber is not restricted to dense timbers such as greenheart or oak, except in conditions where the pile is subject to alternate wetting and drying such as in piles  supporting jetties in tidal conditions. In numerous structural surveys of Victorian buildings the authors’ practice has discovered, in good condition below the water-table level, timbers such as birch, larch, pine, etc.

Thursday, February 7, 2013

Piles - Typical Applications.

Typical applications of piling are:

(1) Where soil of low bearing capacity of significant depth is underlain by strong strata.

Piling which transfers the foundation load to the strong strata is frequently a more economic solution than alternative foundations (see Fig. 14.1).


Stiff strata at depth.
Fig. 14.1 Stiff strata at depth.

(2) Where the surface strata is susceptible to unacceptable settlement, and is underlain by stiff material (see Fig. 14.2).

Compressible strata.
Fig. 14.2 Compressible strata.

On a low-cost site the authors’ practice has installed 18 m long in situ concrete piles to support two-storey domestic housing. The increased cost of the piles was more than compensated for by the low cost of the site.

(3) Where surface foundation would impose unacceptable increase in bearing pressure, or surcharge, on
existing foundations (see Fig. 14.3).



 Load transfer below existing foundation.
Fig. 14.3 Load transfer below existing foundation.

(4) Where the foundation is subject to lateral loads which can be more economically resisted by raking piles (see Fig. 14.4).



Lateral resistance.
Fig. 14.4 Lateral resistance.

(5) Where variations in the compressibility of the soil would lead to excessive differential settlement of surface foundations (see Fig. 14.5). The leaning tower of Pisa is a classic example of differential settlement.


Variable compressibility.
Fig. 14.5 Variable compressibility.

(6) Where excavation to firm strata would prove ex- pensive and difficult, e.g. soft waterlogged alluvial deposits. On one important contract, near the coast in North Wales, it was found that the proposed structure
was sited over a glaciated channel filled to a depth  of 15 m with a soft, highly saturated silt which was impossible to dewater. Excavation and foundation construction would have been difficult and expensive.

(7) Where, on sloping sites, it is necessary to transfer the additional load to a level below the possible slip circle (see Fig. 14.6).


Load transfer below critical slip circle.
Fig. 14.6 Load transfer below critical slip circle.

(8) Where anchoring of a flotation foundation by tying down or tension pile is necessary (see Fig. 14.7).


Anchorage against flotation.
Fig. 14.7 Anchorage against flotation.

(9) Where heave and swelling of clay could exert excessive forces and movements on surface spread foundations.

(10) Whenever piling is a more economic solution. In the past few decades there have been advances in piling manufacture and construction which have considerably reduced the cost of piling. Piling is no longer a last resort but can be considered as an economic alternative in foundation design.

Piles should be used with caution, if at all, where the ground is subject to significant lateral movement, e.g. in areas affected by mining, as such movements can shear off the piles leaving the structure unsupported.

Design Example: Holed balanced foundation.

This example again makes use of the same building as in the previous examples. The trapezoidal shape will be squared off to give a 3.0 m × 8.325 m rectangular outline, as shown in Fig. 12.12.

To minimize differential settlements – both within the base and between adjacent bases – the combined base will be designed as a balanced foundation, with a bearing pressure equal to the allowable bearing pressure na = 150 kN/m2.

A balanced holed  foundation will be investigated for this example. By inserting a hole off-centre to the centroid of  the 3 m × 8.325 m base, it is possible to cause the centre  of gravity of the base to shift until it coincides with that of the applied loads.

Holed balanced foundation design example – loads.
Fig. 12.12 Holed balanced foundation design
example – loads.

The superstructure total load coming onto the base is given by

Area of hole
The area of the holed base is given by

A = (area of unholed base) − (area of hole)
= Au − Ah

From Fig. 12.12, the area of the unholed base is given by

Au = 3.0 × 8.325
= 24.5 m2

The size of the hole would optimally be chosen to give a bearing pressure equal to the allowable bearing pressure, i.e.


Thus the required area of the hole is

Ah = Au − A
= 25.0 − 20.0
= 5.0 m2

Condition for a balanced holed foundation
For a balanced foundation, the centre of gravity of the holed base is required to coincide with the centroid of applied loads. Let Y be the distance from the centre of the unholed base to the centroid of applied loads, and Yh the distance to the centre of the hole. From Figs 12.12 and 12.13, taking moments of area about x–x, Y is given by

YA = 0(Au) + Yh(Ah)

Thus


This is the condition for a balanced foundation.

From Fig. 12.12, Y = 0.34 m. Thus


Holed balanced foundation design example – hole size.
Fig. 12.13 Holed balanced foundation design
example – hole size.

Dimensions of base
To achieve a balanced foundation, the centre of the hole must be at a distance of Yh = 1.36 m from the centre of the unholed  base. Provided this condition is met, the actual shape of the hole, e.g. square or rectangular, is not critical.

The area of the hole was calculated earlier in this example as Ah = 5.0 m2. A rectangular hole will be adopted in this instance, having dimensions of 1.6 m × 3.125 m = 5.0 m2 (see Fig. 12.13).
 
Ultimate design pressure
The holed base has been sized to give a bearing pressure at working loads of 150 kN/m2 . The ultimate design pressure for reinforcement design, pu, is calculated as follows, with γP = 1.51 as in the previous example,

Wednesday, February 6, 2013

Design Example: Trapezoidal balanced foundation.

This example deals with the same building considered in the previous two examples, and designs the foundations for the perimeter columns where these occur along a site boundary, as shown in Fig. 12.11. As in the previous examples, the close proximity of the perimeter columns to the site boundary means that isolated pad foundations are not suitable, and that the foundations of the perimeter columns must be combined with those of the adjacent  internal columns.

Since the ratio of internal to perimeter loads is 2 : 1, i.e. the same as in Design Example 2 (section 12.3.4), the centroid  of loads will again be 2.0 m from grid line B. A 9.0 m long base, as in Design Example 2, would therefore again be required to achieve a balanced rectangular foundation.

This relatively long base would however be associated with comparatively large bending moments and reinforcement areas. A more economic foundation is likely to be achieved using a shorter trapezoidal balanced foundation.


 Trapezoidal balanced foundation design example.
Fig. 12.11 Trapezoidal balanced foundation design
example.

Condition for a balanced trapezoidal foundation
Again the condition for a balanced foundation is for the centre of gravity of the base to coincide with the centroid of the applied loads.

With reference to Fig. 12.11, and taking moments of area about x–x, the location of the centre of gravity of the base of area A is given by


Area of base
The values of B1 and B2 would normally be chosen to minimize the size of the base. This would result in a bearing  pressure equal to the allowable bearing pressure, na, giving a base area


Dimensions of base
The end of the base furthest from the site boundary will,  in this instance, be chosen to extend beyond grid line B  by the same amount as a standard 3.65 m × 3.65 m internal pad foundation (see section 12.3.4), i.e. extending by 3.65/2 = 1.825 m.

Thus, from Fig. 12.11,

These values will give a balanced trapezoidal foundation, with a bearing pressure of p = 150 kN/m2.

Ultimate design pressure
The combined dead and imposed partial load factor is  γP = 1.51, as in the previous examples. The ultimate design pressure for reinforcement design, pu, is given by

Design Example: Cantilever Balanced Foundation.

An existing live service run requiring a 1.5 m wide zone is required to pass along one edge of the combined base in the previous example, as indicated in Fig. 12.10. The design is required to be adjusted accordingly.

Before redesigning the foundation, the designer should explore the possibilities, and relative costs, of either persuading the services engineer to relocate these services,  or setting back the two columns on grid line 1, and cantilevering the building out to the site boundary at each floor level. Either solution may well prove more economic than changing the foundation.

If these options fail to bear fruit, the designer will need to design the combined base to cantilever over the service zone without loading it. As in the previous example, the base will be designed as a balanced foundation.

Cantilever balanced foundation design example.
Fig. 12.10 Cantilever balanced foundation design example.

Size of base
The column loads and positions are unchanged, and therefore the centroid of the superstructure loads remains in  the same place as in the last example. Again a balanced

foundation will be achieved by making the centre of gravity of the effective base (i.e. the centroid of the uniform stress block below the base) coincide with that of the applied loads.

The service zone does not affect the centre of gravity of the base in the Y direction, and the overall dimension in this direction for a balanced foundation therefore remains at  9 m. In the x direction, the 1.5 m width of the service zone is discounted in considering the effective base area.

The weight of the cantilever section of the slab acts as a  net applied load in this direction and must be taken into account in calculating the centroid of all applied loads.

It will therefore be included as part of the superstructure load, P.

The weight of this strip of foundation is


With reference to Fig. 12.10, the distance from the centroid to the effective left-hand edge of the base is 5.0 − 2.25 = 2.75 m. Thus, in order to align the centre of gravity with the  centroid of applied loads, the right-hand edge of the  base must also be located at 2.75 m from the centroid of  the applied loads. This gives an effective horizontal base  width of 2 × 2.75 m = 5.5 m, and a total horizontal base width of 5.5 + 1.5 = 7.0 m. The effective area of the base is given by


Bearing pressure
The actual bearing pressure will be


Ultimate design pressure
From design example 2, the imposed load Q is 55% of the 4500 kN column loads, i.e.

Thursday, January 31, 2013

Design Example: Rectangular Balanced Foundation.

A five-storey concrete-framed office building has columns located on a regular 6 m × 6 m grid. The soil is a sandy clay with a net allowable bearing pressure, na = 150 kN/m2.
 
Loadings
The column loads are as follows:
Internal column: 2000 kN
Perimeter column: 1000 kN
Corner column: 500 kN

The imposed load may be taken to be 55% of the total load for all columns. Thus, from Fig. 10.20, the combined partial load factor γP = 1.51.


 Combined partial safety factors for dead + imposed loads.
Fig. 10.20 Combined partial safety factors for dead +
imposed loads.
Size of isolated pad bases
Normal internal column foundations have been chosen to be isolated pad foundations, with an area given by


which for a square base gives plan dimensions of 3.65 m × 3.65 m. This size will be used for internal columns,  with proportionally smaller sizes for perimeter and corner columns.

The building is however built tight to the site boundary along two sides, as shown in Fig. 12.9. To keep foundations within the site boundary, the four columns adjacent  to the corner will share a combined base.
The base  will be designed as a rectangular balanced foundation  in order to minimize bearing pressures and differential  settlements.

Rectangular balanced foundation design example.
Fig. 12.9 Rectangular balanced foundation design example.


Size of combined base
Superstructure total load, ∑ P = 2000 + 1000 + 1000 + 500 = 4500 kN

Taking moments about grid line 2 to calculate the distance of the centroid of the column loads from this grid line,


Similarly, by symmetry, Y = 2.0 m.

To achieve a balanced foundation, it is necessary to provide a base whose centre of gravity coincides with the centroid of the applied loads. The distance, in either direction, from the centroid of loads to the site boundary edge of the base  is 6.5  − X = 4.5 m: therefore if the opposite edge is like- wise located 4.5 m from the centroid of loads, the two will coincide. Thus a 9 m × 9 m base will provide a balanced foundation in this situation.

The base will only remain exactly balanced if all four columns have the same level of imposed loading. From a foundation point of view this is unlikely to be critical unless extreme variations in the distribution of imposed loads occur. Where such variations are expected, these should be designed for as a separate load case.

Bearing pressure 
The actual bearing pressure will be equal to


The value of p (= 56 kN/m2) indicates that, although the  balanced foundation would limit differential settlement between the four columns sharing the base, it would not, for this particular building example, reduce differential  settlements between columns on this base and those on adjacent bases. Adjacent bases would be sized to give bearing pressures close to the allowable value of na = 150 kN/m2.

The superstructure would therefore be required to accom- modate the differential settlement between the combined corner base and the adjacent isolated bases. If it is unable  to accommodate these differential settlements, the bearing pressure on the balanced foundation could be increased, within limits, by turning the foundation into a holed balanced foundation. In this particular example this would involve cutting a hole out of the centre of the base, thus reducing the area of the base. Provided the centre of gravity of the base remains in line with the centroid of applied loads, the bearing pressure would remain uniform, but its magnitude would increase.

Ultimate design pressure
The ultimate design pressure for reinforcement design  is given by pu =γPp, where  γP is the combined dead and imposed partial load factor.

Tuesday, January 29, 2013

Balanced foundations (rectangular, cantilever, trapezoidal and holed) Design.

Design decisions
The decision to use a combination of column loads to produce a combined balanced foundation would depend upon a number of factors, for example:

(1) The spacing of the point loads.
(2) The combination of loads being considered.
(3) The restrictions of projections due to site boundaries.
(4) The overall eccentricities produced from the resultant of the loads.
(5) The bearing area available.
(6) The need to produce a uniform pressure.
(7) The economics compared to other possible alternatives, if any. For example, in some situations a combination of column loads can be used to balance out eccentric loads which would otherwise extend isolated foundations beyond the boundaries of the site. Balancing out these column loads means that the boundaries can be maintained within a base giving uniform pressure and this may prove more economic than say a piled solution.

In other situations an attempt to balance out the loads may produce cantilevers which would extend beyond the site boundaries therefore making it necessary to look at alternative column combinations or alternative means of support such as piling.

In most cases where these foundations are adopted they relate to: boundaries which are restrictive; foundations which would otherwise overlap; or situations where, by introducing a load from other columns onto the same  foundation, bending moments are reduced and pressures become more uniform.

Sizing up the design

(1) Rectangular balanced foundations
The foundation base is designed by calculating the position of the resultant applied load and making the centre of gravity of the base coincide with that of the downward load.

This is done by first calculating the area of the base required to resist the resultant load and then finding the most  economic rectangular pad to achieve this. The pad is then located so that its centre of gravity is in the same position as the resultant load (see Fig. 12.6).


Rectangular balanced pad base.
Fig. 12.6 Rectangular balanced pad base.

The base is then designed to resist the bending moments and shear forces produced by the solution, and the depth and reinforcement are determined and detailed accordingly.

(2) Cantilever balanced foundations
The design of the cantilever balanced foundation is carried out by assuming locations for the pad supports based upon the physical considerations and calculating the reactions from the cantilever beam. The reactions are then accommodated by calculating the required size of rectangular pads for each reaction based upon a uniform bearing pressure.

The beam is then designed to support the loads from the superstructure taking account of the induced bending and shear forces, etc. (see Fig. 12.7 for a typical example).


Bending and shear diagram for typical cantilever base.
Fig. 12.7 Bending and shear diagram for typical
cantilever base.

(3) Trapezoidal balanced foundations
The design is carried out by first of all calculating the area of the base required for a uniform pressure to resist the total applied load. The resultant load and its point of application is then calculated. By fixing the dimensions for the length of the base, the dimensions A and B (see Fig. 12.8 (a)) can be calculated to give a centre of gravity which coincides with the location of the resultant load.


Trapezoidal and holed balanced foundation.
Fig. 12.8 Trapezoidal and holed balanced foundation.

The applied bending moments and shear forces are then calculated and the reinforced foundation designed to suit.

(4) Holed balanced foundations
The design is carried out by first calculating the resultant load and its location. The area required for the base is then determined by dividing the resultant load by the allowable bearing pressure. By fixing the length of the base an average width can hence be determined, and by inspection  of the eccentricity of the resultant load, an allowance can  be made for an approximate size of hole and a trial width determined (see Fig. 12.8 (b)).

From this trial width a size and location for the hole can  be calculated to give a centre of gravity for the base which will coincide with that of the applied loads and result in a uniform pressure.

Having determined the base dimensions the bending moments and shear forces can be calculated and the foundation design completed.

(5) General sizing considerations
The size of the sections involved is based upon bending moments, shear forces and bond stresses in a similar manner to any other reinforced concrete section. With foundations, however, due to the slightly reduced shuttering cost for concrete below ground compared to elevated sections,  it is often more economic to go for slightly larger concrete sections to avoid the use of excessive shear reinforcement or large-diameter bars.
Each condition will demand dif- ferent sizes and therefore the engineer will need to deter- mine the initial size from a feel of engineering, which will develop with experience. The design may then be finalized by trial and error.

Design Example: Tied Portal Frame Base.

The pad bases for a single-bay portal frame are to be joined by a horizontal tie to take out the horizontal thrusts from the portal legs. The portal is similar to the one which was designed as an untied portal in section 11.3.4. Loads and dimensions are shown in Fig. 12.4.

Loadings
From section 11.3.4,

vertical superstructure load, P = (dead load)
                                                + (imposed load)
                                               = G + Q
                                               = 175 + 225
                                               = 400 kN

Q as a percentage of P is 100 Q/P = (100 × 225)/400 = 56%.

From Fig. 10.20, the combined partial factor for dead and imposed loads is γP = 1.51.

Horizontal thrust, H = 50 kN

The horizontal thrust H arises from vertical loads G and Q, and will therefore have the same combined partial load  factor γP = 1.51.
 
Size of base
From section 11.3.4, the net allowable bearing pressure, na = 300 kN/m2.

On the basis that the horizontal thrust will be taken out by the tie joining the portal feet, the minimum area of foundation required is

A base 1.2 m × 1.2 m will therefore be chosen. Comparison with the example in section 11.3.4 shows that the introduction of the horizontal tie has reduced the base size.

Design of horizontal tie
The tie will be a mild steel bar, as shown in Fig. 12.5, encased in concrete for durability.

Ultimate tensile force in bar, Hu =γPH
                                               = 1.51 × 50
                                                = 76 kN

From BS 8110, the characteristic tensile stress fy = 250 N/mm2 for hot rolled mild steel. The partial material factor γs = 1.05.

The required cross-sectional area of bar is

Provide one number 25 mm diameter mild steel bar (area  = 491 mm2 ) to act as the tie. This will need to be  adequately anchored into the pad base as shown in Fig. 12.5.

To prevent possible foundation spread from lack of fit, the tie will incorporate a turn-buckle, to take up any slack prior to steel erection.

Tied base design example – tie rod detail.
Fig. 12.5 Tied base design example – tie rod detail.

Monday, January 28, 2013

Tied foundations - Design.

Introduction
Tied foundations are often adopted as a means of exploiting to advantage opposing forces. This is achieved by linking them together via a tie or tie beam. The effect this has on  the design is to reduce the horizontal force requiring to be resisted by the ground (see Fig. 12.1 (a)).

The use of a tie can reduce the amount of movement likely to occur in developing the reaction and reduce the cost of the foundation.

 Tied foundation.
Fig. 12.1 Tied foundation.

Design decisions
In any situations where horizontal forces, such as thrusts from portal frames, etc., act in opposite directions, consideration should be given to connecting the forces via a tie in order to reduce or totally react a horizontal force. For example, if the forces are equal and opposite then the total force can be reacted. On the other hand, if the forces are opposite and not equal, the smaller of the two forces can be tied and the remainder left to be reacted by foundation 1 or, if a higher tie force is used, foundation 2 can also be utilized, thereby reducing the force to be taken in passive pressure (see Fig. 12.1 (b)).

Sizing the foundations
The main pad foundations are designed in the same way as those previously discussed in Chapter 11 but taking into account the tie force reaction in accordance with the above considerations. The tie itself must be designed to resist the force H1 or H2, as the case may be, and must be detailed to
transfer this force without excessive slip or failure between the bases of the stanchions.

This is usually achieved by designing a tie rod for the total force using appropriate permissible tensile stresses for the steel and ensuring that suitable mechanical anchorage or bond anchorage is achieved in the details between the  stanchion and tie (see Fig. 12.2).

In detailing these ties, the detailer should ensure that the  tie acts on the centreline of the horizontal thrust force or that any eccentricity produced is designed into the foundation by the designer. The tie rod itself could contain a turn-buckle for tensioning in order to reduce lateral movement due to possible slackness in the rod, alternatively, if adjustment is not required, a reinforced concrete tie beam as shown in Fig. 12.3 could be used. Care should be taken  to ensure axial tension across any connections which may  be required in the tie by the use of turn-buckle or male/ female-type plate connectors. In the case of portal framed factories it is often desirable to construct the floor slab after
erection and cladding of the building. In this case the engineer must ensure that all tie members are constructed and covered prior to the erection of the steelwork, in order that the presence of the tie members does not impede the construction process.

Tie anchorage.
Fig. 12.2 Tie anchorage.


Reinforced concrete tie beam.
Fig. 12.3 Reinforced concrete tie beam.

Tied and Balanced Foundations.

General Introduction
Tied and balanced foundations are used to combine a number of superstructure loads in order to achieve acceptable bearing pressure. The combined base is used to balance out or tie together difficult eccentricities of loading or horizontal forces. Such foundations usually result from an engineering study of the superstructure loads to be transmitted onto the foundation. The engineer’s aim is to make the best use of the magnitude and direction of such forces in balancing out or tying together eccentric reactions and horizontal thrust to economically achieve the required ground bearing pressures.

Particular problems exist where large lateral forces are transferred at the top edge of a foundation from say portal frames or when large column loads occur at or near site boundaries. Fortunately portal frames tend to have an equal and opposite leg with similar opposing horizontal forces which can be reacted against each other. Buildings with large column loads near to the boundary tend also to have other large column loads either internal to the building or on an opposite boundary. The internal or opposite columns can therefore be used to stabilize the moments produced  by the eccentricity from the outer perimeter frame. Typical examples are given in the following sections.

Tuesday, January 22, 2013

Tied and Balanced Foundations.

General introduction
Tied and balanced foundations are used to combine a number of superstructure loads in order to achieve acceptable bearing pressure. The combined base is used to balance out or tie together difficult eccentricities of loading or horizontal forces. Such foundations usually result from an engineering study of the superstructure loads to be transmitted onto the foundation. The engineer’s aim is to make the best use of the magnitude and direction of such forces in balancing out or tying together eccentric reactions and horizontal thrust to economically achieve the required ground bearing pressures.

Particular problems exist where large lateral forces are transferred at the top edge of a foundation from say portal frames or when large column loads occur at or near site boundaries. Fortunately portal frames tend to have an equal and opposite leg with similar opposing horizontal forces which can be reacted against each other. Buildings with large column loads near to the boundary tend also to have other large column loads either internal to the building or on an opposite boundary. The internal or opposite columns can therefore be used to stabilize the moments produced  by the eccentricity from the outer perimeter frame. Typical examples are given later.

Design - Jacking Raft

Introduction
Raft foundations suitable for jacking are specifically designed versions of crust rafts, cellular rafts, lidded cellular rafts, beam strip rafts or other foundations whose stiffness and behaviour is designed to resist the jacking forces and moments involved in the process of re-levelling.

The raft is designed to cater for the bending and shear forces likely to be produced during subsidence and relevelling activity. Jacking points are built into the foundation to allow for re-levelling and the type of raft and
number of jacking points depends to a large extent on the proposed use, the size of the structure and the predicted subsidence likely to occur.

The need for a jacking raft tends to be determined by the unpredictability of subsidence and the practicalities for the building user of re-levelling within the life of the building.

As mentioned previously, domestic sites in areas of brine mining are typical of sites where such foundations have been adopted and basically two design conditions need to be considered.

(1) To design for the normal subsidence condition for the site including bending moments and forces as previously discussed for the raft type.
(2) Additional analysis and design to incorporate the structural requirements to resist stresses and distortions during the jacking operations.

Sizing the design
It can be seen that the initial sizing of the foundation for trial design would be to adopt generous sizes for a standard raft of the type being proposed in anticipation of embracing the jacking stresses.

The stresses produced during jacking are dependent on the restrictions and methods of jacking and therefore tend to be one-off designs for set conditions.

Design - Buoyancy Raft.

Introduction
The buoyancy raft works on a similar principle to that of a floating structure where the support for the raft is mainly obtained by displacing the weight of earth or overburden by the volume of a large voided foundation.

The raft  is described previously and is often economically achieved by making use of the voids as a basement structure (see Fig. 13.42).

Buoyancy foundation/basement.
Fig. 13.42 Buoyancy foundation/basement.

It is designed so that sufficient overburden is removed to allow the superstructure load to be applied to the ground with little or no increase in the original stress which existed on the sub-strata prior to excavation and construction. Thus the structure floats like a ship – which displaces water equal to its own weight.

The bottom slab can form the basement of the proposed building, and be combined with the ground slab and retaining walls to act as the raft. It can also be of cellular form (see Fig. 13.43).

Cellular buoyancy foundation.
Fig. 13.43 Cellular buoyancy foundation.

The raft design takes into account any eccentricity of load and aims to keep differential settlements and tilting within acceptable limits (see Fig. 13.44), which shows how eccentric resultant loads can be caused by the basement projections, producing a uniform bearing pressure.


Eccentrically loaded buoyancy raft.
Fig. 13.44 Eccentrically loaded buoyancy raft.
Since buoyancy foundations are expensive compared to more traditional forms they tend only to be used where suitable bearing strata is at too great a depth for other more traditional alternatives. For this reason the foundation tends to be restricted to sites on very deep alluvial deposits such as soft sands and silts and where loads on the foundations can be kept concentric. Examples of such building types would be schemes where deep basements can be economically incorporated into the design or where underground tanks are required.
The cases therefore where the engineer would adopt such solutions tend to be limited.

2 Sizing the design
The overall sizing of the design would generally involve:

(1) Calculating the depth plan size and centre of gravity required for the overburden removal to suit structural buoyancy.
(2) Comparing the results of (1) with the requirements for tanks or basements to suit client’s needs.
(3) Calculating the water pressure for (1) to check for  flotation.
(4) Combining the requirements of (1), (2) and (3) into a mutually suitable voided foundation.
(5) Designing the external walls, floors, roof and separating wall elements for the pressures, bending moments and shear forces including any projections to prevent flotation.