Figures 17.7(a) to (h) give the sequence of operations. Withdrawl of the casing, if not done carefully, may lead to voids or soil inclusions in the concrete, as illustrated in Fig. 17.8.
Figure 17.7 Casing method of construction: (a) initiating drilling, (b) drilling
slurry; (c) introducing casing, (d) casing is sealed and slurry is being removed
interior of casing (continued)
slurry; (c) introducing casing, (d) casing is sealed and slurry is being removed
interior of casing (continued)
Figure 17.7 (continued) casing method of construction: (e) drilling below casing
(f) underreaming, (g) removing casing, and (h) completed shaft (O'Neill and
Reese, 1999)
(f) underreaming, (g) removing casing, and (h) completed shaft (O'Neill and
Reese, 1999)
Figure 17.8 Potential problems leading to inadequate shaft concrete due to
removal of temporary casing without care (D'Appolonia, et al., 1 975)
removal of temporary casing without care (D'Appolonia, et al., 1 975)
more information about water filled voids please
ReplyDeleteIf you are a single working person or a student, then you should need to find out paying guest in Gurgaon to get excellent services and enjoy a safe and secure stay. Before finding a pg accommodation, you should need to get some opinions of people about the PG from that are currently living or have lived there previously. https://shreedurgapg.com/paying-guest-in-gurgaon/