After drilling is complete, the bottom of the hole is underreamed if required. Fig. 17.6(b) and (c) show the next steps of concreting and placing the rebar cage. Fig 17.6(d) shows the hole completely filled with concrete.
Figure 17.6 Dry method of construction: (a) initiating drilling, (b) starting concrete
pour, (c) placing rebar cage, and (d) completed shaft (O'Neill and Reese, 1999)
pour, (c) placing rebar cage, and (d) completed shaft (O'Neill and Reese, 1999)